Your Cart
Loading

Super Deals — Limited Time
Lifetime Access Pass

Unlock every template
with one single payment.

✔️ All current templates included
All future templates free
📂 Excel + Google Sheets
💸 One-time payment only
Today’s Offer
$99 USD
$900+ total value
Up to 90% Off
🔓 Get Lifetime Access Now
One payment. Lifetime access. All current + new templates added in the future.

All-in-One Project Management Template with Dashboard, Gantt Chart & Kanban (Excel + Google Sheets)

On Sale
$21.00
$21.00
Added to cart

Transform the way you manage projects with this fully interactive, all-in-one project management spreadsheet template, designed for professionals who need clarity, control, and simplicity — all inside Excel and Google Sheets.

This template includes beautiful dashboards, automated charts, advanced Gantt timelines, drag-and-drop Kanban boards, daily task logs, weekly calendars, monthly planners, and an entire stickies gallery that gives you a visual project experience unlike any other spreadsheet.

Whether you're a project manager, freelancer, business owner, or student — this template gives you everything you need to plan, track, and complete projects effectively.


What Makes This Template Exceptional


Every sheet is professionally designed, visually stunning, and fully automated — offering a complete project manager’s workspace that normally requires multiple apps.

Below is a breakdown of the exact features you get, based on the real sheets in your file:


1. Professional Project Dashboard (Real-Time Data)


A clean, beautifully designed dashboard including:

✔️ Status breakdown pie chart

✔️ Member workload bar chart

✔️ Project progress comparison

✔️ Quick Access buttons (Timeline, Daily Tasks, Weekly Schedule, Monthly Planner, Notes)

✔️ Announcement board

✔️ Urgent tasks panel

✔️ Auto-updated metrics and progress reads

This dashboard instantly gives you a full overview of your entire project — at a glance.


2. Advanced Gantt Chart Project Timeline


A complete, scrollable timeline with:

✔️ Start & end dates

✔️ Project duration & days passed

✔️ Days left to deadline (auto-calculated)

✔️ Current task status (color-coded)

✔️ Progress percentages with bars

✔️ Automatic Gantt bars that extend across days

✔️ Overdue status indicators (red)

✔️ Multiple tasks assigned to different members

✔️ Visual clarity for long-term projects

This timeline is structured exactly like PMO-level project tools — but easier and faster to use.


3. Daily Tasks Manager + Hours Tracking


A structured daily log allowing you to track:

✔️ Activity name

✔️ Category (Meeting, New Task, Ongoing, Done, Cancelled)

✔️ Time in / time out

✔️ Total hours auto-calculated

✔️ Status dropdown (Planned, In Progress, Complete, For Review)

Perfect for freelancers, employees, and managers who need accurate daily time tracking.


4. Kanban Board (Planned – In Progress – For Review)


A real Kanban board built inside the spreadsheet, with:

✔️ Drag-and-drop feel using colored sticky cards

✔️ Real-time sync with daily tasks

✔️ Clear visibility of what’s happening today

This is one of the most visually appealing Kanban systems you’ll find in Excel/Sheets.


5. Weekly Schedule (Hourly Planner)


A full weekly calendar that includes:

✔️ Hour-by-hour schedule

✔️ Auto-date generation

✔️ Upcoming schedule preview

✔️ Space for events, tasks, meetings, sprints

✔️ A clean professional UI for weekly planning

Ideal for managing busy weeks and balancing multiple tasks.


6. Weekly Schedule — Stickies Version


A more creative weekly view combining:

✔️ Sticky note cards

✔️ Color-coded tasks

✔️ Visual planning

Perfect for brainstorming or building a flexible weekly plan.


7. Monthly Planner (Calendar View)


A complete monthly layout with:

✔️ Auto-filled dates

✔️ Space for daily tasks

✔️ Top 3 goals

✔️ Priority list

✔️ Clean editable layout

Great for long-term planning and milestone mapping.


8. Monthly Planner — Stickies Version


A visual monthly setup using color-coded arrows instead of text lists.

This version is perfect for:

✔️ Highlighting phases

✔️ Visualizing deadlines

✔️ Tracking month-long initiatives


9. Stickies Gallery (Full Collection)


A dedicated sheet with:

✔️ Dozens of pre-designed sticky shapes

✔️ Rounded notes, arrows, tags, labels

✔️ Multiple colors

✔️ Multiple sizes

✔️ Circular markers, banners, boards

This gallery allows you to design your spreadsheet creatively without any graphic tools.


10. Notes Section


A simple but essential space for:

✔️ Project notes

✔️ Meeting minutes

✔️ Brainstorming

✔️ Key reminders

Everything stays in one place.


Who Is This Template For?


Perfect for:

  • Project managers
  • Team leaders
  • Freelancers
  • Business owners
  • Students
  • Agencies
  • Operations teams
  • HR & admin managers
  • Anyone who needs a structured project workspace


Why You Will Love This Template


✔️ Professional dashboard analytics

✔️ Accurate time tracking system

✔️ Fully automated Gantt chart

✔️ Visual Kanban board

✔️ Weekly & monthly planners

✔️ Interactive sticky notes

✔️ Organized navigation bar

✔️ No formulas required — everything is ready

✔️ Works in Excel and Google Sheets

✔️ Beautiful design that impresses clients & teams

✔️ Saves hours every week


What You Get After Purchase


You will instantly receive:

  • ✔️ Excel file (.xlsx)
  • ✔️ Google Sheets version (via link inside PDF)
  • ✔️ Unlimited use
  • ✔️ Lifetime access & updates
  • ✔️ Professional instructions to get started


🚀 Work Smarter. Stay Organized. Deliver Projects Like a Pro.

This template replaces multiple tools (Trello + Asana + Timesheets + Calendars + Notion boards) in ONE file — giving you the clarity and control you need to manage any project with confidence.


You will get the following files:
  • XLSX (7MB)
  • PDF (211KB)